240Z Construction Pics
the locations
of the shock tower bars and going through the firewall to the main cage
the fuel
cell installation
showing the main cage and the guage layout.
front end
overview with the installation of a chevy x-flow radiator
finally finished
installing the box flares
front end
view- ready for radiator box; and fabricating front air dam.
another front
view and the pit crew
Contact us
e-mail us at Mobilcomm